Our commission was for the detail design of the strip out and reconfiguration of existing plant room to accommodate connections to new ASHP to work in hybrid operation with existing gas boilers. New thermal store, pumps valves, pipework and controls. New electrical distribution and coordination with utilities for upgraded / new electrical supplies. A new external plant room was required to house some of the new equipment.