M&E Contractors: Hayvern Electrical, Valley Mechanical, Active Flooring Solutions
GLD provided detail design services (stage 4/5) for Skyline PS on this new build Church in Heswall. Working to a stage 3 design we provided detailed coordination with the architect as well as sizing and setting out information for the MEP services. These included underfloor heating, ventilation, comfort cooling, ASHP, lighting and controls and small power, distribution and containment.